新闻资讯News

伟肯电气娄封新工厂工程 (071112)

文章来源:   发布时间:2012/07/11   阅读:

Vacon electrical Lou Fengxin factory

Our company had completed the design and construction of air-conditioning engineering with good quality for new plant (Area: 25000 square meters. Using lithium bromide absorption host, the whole system is design with variable air volume, variable water, timely central control and network remote monitoring).

http://www.hiross.org

相关产品